Latest Texas air permits
Pending and recent TCEQ New Source Review applications. Updated daily. Get alerts when matching permits are filed. New to the system? Read TCEQ Air Permitting 101, our plain-English guide.
443 new permits this week.
360 pending renewals in Texas in the next 90 days.
NEXUS HUBBARD POWER, LLC
ReceivedSELF POWERED DATA CENTER
- Received
- Feb 17, 2026
- County
- Hill · Hubbard
- Permit type
- Construction
- Project type
- Initial
NEXUS HUBBARD POWER, LLC
ReceivedSELF POWERED DATA CENTER
- Received
- Feb 17, 2026
- County
- Hill · Hubbard
- Permit type
- Ghgpsd
- Project type
- Initial
NEXUS HUBBARD POWER, LLC
ReceivedSELF POWERED DATA CENTER
- Received
- Feb 17, 2026
- County
- Hill · Hubbard
- Permit type
- Psd
- Project type
- Initial
NRG TEXAS POWER LLC
ReceivedELECTRIC POWER STATION
- Received
- Nov 20, 2025
- County
- Fort Bend · Richmond
- Permit type
- Construction
- Project type
- Renewal
LAPORTE POWER LLC
ReceivedPOWER GENERATION PLANT
- Received
- Sep 19, 2025
- County
- Harris · La porte
- Permit type
- Construction
- Project type
- Amendment / Modification
NRG TOLAR POWER LLC
ReceivedELECTRIC POWER GENERATION FACILITY
- Received
- Sep 19, 2025
- County
- Hood · Tolar
- Permit type
- Construction
- Project type
- Initial
NRG TOLAR POWER LLC
ReceivedELECTRIC POWER GENERATION FACILITY
- Received
- Sep 19, 2025
- County
- Hood · Tolar
- Permit type
- Ghgpsd
- Project type
- Initial
NRG TOLAR POWER LLC
ReceivedELECTRIC POWER GENERATION FACILITY
- Received
- Sep 19, 2025
- County
- Hood · Tolar
- Permit type
- Psd
- Project type
- Initial
FORT WORTH POWER CORE LLC
ReceivedBELL COUNTY POWER PLANT
- Received
- Sep 4, 2025
- County
- Bell · Temple
- Permit type
- Standard Permit
- Project type
- Revision
SJRR POWER LLC
ReceivedSJRR POWER PEAKING FACILITY
- Received
- Aug 19, 2025
- County
- Harris · Houston
- Permit type
- Alternative Means of Control
- Project type
- Initial
PORT COMFORT POWER LLC
ReceivedPORT COMFORT POWER PEAKING FACILITY
- Received
- Aug 19, 2025
- County
- Calhoun · Point comfort
- Permit type
- Alternative Means of Control
- Project type
- Initial
NRG TEXAS POWER LLC
ReceivedELECTRIC POWER GENERATING STATION
- Received
- Aug 12, 2025
- County
- Fort Bend · Thompsons
- Permit type
- Construction
- Project type
- Renewal
NRG TEXAS POWER LLC
ReceivedELECTRIC POWER GENERATION FACILITY
- Received
- Jul 25, 2025
- County
- Fort Bend · Thompsons
- Permit type
- Construction
- Project type
- Renewal
GENTEX POWER CORPORATION
ReceivedINCREASE STARTUP TIME
- Received
- Jul 14, 2025
- County
- Bastrop · Bastrop
- Permit type
- Construction
- Project type
- Amendment / Modification
ACCELERATED MOBILE POWER LLC
ReceivedELECTRIC POWER GENERATION FACILITY
- Received
- May 27, 2025
- County
- Reagan · Midkiff
- Permit type
- Construction
- Project type
- Initial
GENTEX POWER CORPORATION
ReceivedSTANDARD PERMIT FOR EXISTING REGISTRATION
- Received
- Mar 19, 2025
- County
- Bastrop · Bastrop
- Permit type
- Standard Permit
- Project type
- Amendment / Modification
ACCELERATED MOBILE POWER LLC
ReceivedPEMBROOK GAS PLANT MOBILE POWER STATION
- Received
- Mar 3, 2025
- County
- Upton · Midkiff
- Permit type
- Construction
- Project type
- Initial
COLORADO BEND II POWER LLC
ReceivedGAS POWERED ELECTRICITY GENERATION
- Received
- Feb 3, 2025
- County
- Wharton · Wharton
- Permit type
- Construction
- Project type
- Renewal
SOUTHWESTERN ELECTRIC POWER COMPANY
ReceivedPOWER GENERATION PLANT
- Received
- Jan 24, 2025
- County
- Harrison · Hallsville
- Permit type
- Construction
- Project type
- Initial
BHER POWER RESOURCES INC
ReceivedPOWER GENERATION
- Received
- Dec 16, 2024
- County
- Howard · Big spring
- Permit type
- Construction/Operating
- Project type
- Renewal
GENTEX POWER CORPORATION
ReceivedCORRECT ERROR ON MAERT
- Received
- Oct 23, 2024
- County
- Bastrop · Bastrop
- Permit type
- Standard Permit
- Project type
- Revision
GENTEX POWER CORPORATION
ReceivedCORRECT ERROR ON EMISSION SUMMARY TABLE
- Received
- Sep 26, 2024
- County
- Bastrop · Bastrop
- Permit type
- Standard Permit
- Project type
- Revision
GENTEX POWER CORPORATION
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Sep 18, 2024
- County
- Bastrop · Bastrop
- Permit type
- Standard Permit
- Project type
- Initial
POWERSECURE INC
ReceivedELECTRIC POWER GENERATION
- Received
- Sep 17, 2024
- County
- Dallas · Dallas
- Permit type
- Construction
- Project type
- Initial
POWERSECURE INC
ReceivedELECTRIC POWER GENERATION PLANT
- Received
- Sep 17, 2024
- County
- Fort Bend · Stafford
- Permit type
- Construction
- Project type
- Initial
HOMESTEAD POWER LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Jul 16, 2024
- County
- Austin · New ulm
- Permit type
- Standard Permit
- Project type
- Initial
BULLDOG POWER LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- May 17, 2024
- County
- Brazoria · Sweeny
- Permit type
- Standard Permit
- Project type
- Initial
POWERSECURE INC
ReceivedELECTRIC POWER GENERATION
- Received
- Apr 11, 2024
- County
- Denton · Cross roads
- Permit type
- Construction
- Project type
- Amendment / Modification
POWERSECURE INC
ReceivedELECTRIC POWER GENERATION
- Received
- Jan 29, 2024
- County
- Montgomery · New caney
- Permit type
- Construction
- Project type
- Initial
POWERSECURE INC
ReceivedELECTRIC POWER GENERATION FACILITY
- Received
- Jan 10, 2024
- County
- Collin · Prosper
- Permit type
- Construction
- Project type
- Initial
SOLARIS POWER SOLUTIONS LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Sep 10, 2026New
- County
- Ellis · Midlothian
- Permit type
- Standard Permit
- Project type
- Initial
BASE POWER INC
ReceivedPBR NEW REGISTRATION
- Received
- Sep 4, 2026
- County
- Travis · Austin
- Permit type
- Permit by Rule
- Project type
- Initial
TEMPLE B2 POWER SOLUTIONS LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Sep 4, 2026New
- County
- Bell · Temple
- Permit type
- Standard Permit
- Project type
- Initial
FORT WORTH POWER CORE LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Aug 27, 2026
- County
- Briscoe · Silverton
- Permit type
- Standard Permit
- Project type
- Initial
PONDEROSA JOINT POWERS AGENCY
ReceivedCASE-BY-CASE EXISTING
- Received
- Aug 26, 2026
- County
- Harris · Houston
- Permit type
- Construction
- Project type
- Renewal
POWERSECURE, INC.
ReceivedAUTOMATIC RENEWAL 6005
- Received
- Aug 19, 2026
- County
- Nacogdoches · Nacogdoches
- Permit type
- Standard Permit
- Project type
- Renewal
LIBERTY POWER INNOVATIONS LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Aug 19, 2026
- County
- Reeves · Pecos
- Permit type
- Standard Permit
- Project type
- Initial
COOPER POWER SYSTEMS LLC
ReceivedTRANSFORMER MANUFACTURING FACILITY
- Received
- Aug 11, 2026
- County
- Nacogdoches · Nacogdoches
- Permit type
- Construction
- Project type
- Initial
RW MILLER POWER LLC
ReceivedCASE-BY-CASE EXISTING
- Received
- Aug 11, 2026
- County
- Palo Pinto · Palo pinto
- Permit type
- Construction/Operating
- Project type
- Amendment / Modification
COLETO CREEK POWER, LLC
ReceivedRENEWAL NOTICE
- Received
- Aug 11, 2026
- County
- Goliad · Fannin
- Permit type
- Construction
- Project type
- Renewal (notice)
RW MILLER POWER, LLC
ReceivedELECTRIC GENERATION FACILITY
- Received
- Aug 11, 2026
- County
- Palo Pinto · Palo pinto
- Permit type
- Psd
- Project type
- Initial
WOLF HOLLOW I POWER LLC
ReceivedPBR NEW REGISTRATION
- Received
- Jul 31, 2026
- County
- Hood · Granbury
- Permit type
- Permit by Rule
- Project type
- Initial
BECHTEL INFRASTRUCTURE AND POWER CORPORATION
ReceivedTEMPORARY ROCK CRUSHER
- Received
- Jul 16, 2026
- County
- Reeves · Pecos
- Permit type
- Standard Permit
- Project type
- Initial
COLETO CREEK POWER LLC
ReceivedNATURAL GAS BOILER
- Received
- Jul 13, 2026
- County
- Goliad · Fannin
- Permit type
- Construction
- Project type
- Amendment / Modification
STELLA POWER COMPANY LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Jul 10, 2026
- County
- Caldwell · Mustang ridge
- Permit type
- Standard Permit
- Project type
- Initial
KINETIK POWER LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Jul 1, 2026
- County
- Reeves · Balmorhea
- Permit type
- Standard Permit
- Project type
- Initial
HIVOLT POWER V LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Jun 18, 2026
- County
- Loving · Mentone
- Permit type
- Standard Permit
- Project type
- Initial
NRG TEXAS POWER LLC
ReceivedCASE-BY-CASE EXISTING
- Received
- Jun 15, 2026
- County
- Chambers · Baytown
- Permit type
- Construction
- Project type
- Revision
NRG TEXAS POWER LLC
ReceivedCASE-BY-CASE EXISTING
- Received
- Jun 15, 2026
- County
- Chambers · Baytown
- Permit type
- Construction
- Project type
- Sb1126
ATTICUS POWER OPCO 1 LLC
ReceivedSTANDARD PERMIT NEW REGISTRATION
- Received
- Jun 13, 2026
- County
- Bee · Pawnee
- Permit type
- Standard Permit
- Project type
- Initial
| Received | Customer | Project | Permit type | Project type | County | Status |
|---|---|---|---|---|---|---|
Feb 17, 2026 | NEXUS HUBBARD POWER, LLC | SELF POWERED DATA CENTER | Construction | Initial | Hill · Hubbard | Received |
Feb 17, 2026 | NEXUS HUBBARD POWER, LLC | SELF POWERED DATA CENTER | Ghgpsd | Initial | Hill · Hubbard | Received |
Feb 17, 2026 | NEXUS HUBBARD POWER, LLC | SELF POWERED DATA CENTER | Psd | Initial | Hill · Hubbard | Received |
Nov 20, 2025 | NRG TEXAS POWER LLC | ELECTRIC POWER STATION | Construction | Renewal | Fort Bend · Richmond | Received |
Sep 19, 2025 | LAPORTE POWER LLC | POWER GENERATION PLANT | Construction | Amendment / Modification | Harris · La porte | Received |
Sep 19, 2025 | NRG TOLAR POWER LLC | ELECTRIC POWER GENERATION FACILITY | Construction | Initial | Hood · Tolar | Received |
Sep 19, 2025 | NRG TOLAR POWER LLC | ELECTRIC POWER GENERATION FACILITY | Ghgpsd | Initial | Hood · Tolar | Received |
Sep 19, 2025 | NRG TOLAR POWER LLC | ELECTRIC POWER GENERATION FACILITY | Psd | Initial | Hood · Tolar | Received |
Sep 4, 2025 | FORT WORTH POWER CORE LLC | BELL COUNTY POWER PLANT | Standard Permit | Revision | Bell · Temple | Received |
Aug 19, 2025 | SJRR POWER LLC | SJRR POWER PEAKING FACILITY | Alternative Means of Control | Initial | Harris · Houston | Received |
Aug 19, 2025 | PORT COMFORT POWER LLC | PORT COMFORT POWER PEAKING FACILITY | Alternative Means of Control | Initial | Calhoun · Point comfort | Received |
Aug 12, 2025 | NRG TEXAS POWER LLC | ELECTRIC POWER GENERATING STATION | Construction | Renewal | Fort Bend · Thompsons | Received |
Jul 25, 2025 | NRG TEXAS POWER LLC | ELECTRIC POWER GENERATION FACILITY | Construction | Renewal | Fort Bend · Thompsons | Received |
Jul 14, 2025 | GENTEX POWER CORPORATION | INCREASE STARTUP TIME | Construction | Amendment / Modification | Bastrop · Bastrop | Received |
May 27, 2025 | ACCELERATED MOBILE POWER LLC | ELECTRIC POWER GENERATION FACILITY | Construction | Initial | Reagan · Midkiff | Received |
Mar 19, 2025 | GENTEX POWER CORPORATION | STANDARD PERMIT FOR EXISTING REGISTRATION | Standard Permit | Amendment / Modification | Bastrop · Bastrop | Received |
Mar 3, 2025 | ACCELERATED MOBILE POWER LLC | PEMBROOK GAS PLANT MOBILE POWER STATION | Construction | Initial | Upton · Midkiff | Received |
Feb 3, 2025 | COLORADO BEND II POWER LLC | GAS POWERED ELECTRICITY GENERATION | Construction | Renewal | Wharton · Wharton | Received |
Jan 24, 2025 | SOUTHWESTERN ELECTRIC POWER COMPANY | POWER GENERATION PLANT | Construction | Initial | Harrison · Hallsville | Received |
Dec 16, 2024 | BHER POWER RESOURCES INC | POWER GENERATION | Construction/Operating | Renewal | Howard · Big spring | Received |
Oct 23, 2024 | GENTEX POWER CORPORATION | CORRECT ERROR ON MAERT | Standard Permit | Revision | Bastrop · Bastrop | Received |
Sep 26, 2024 | GENTEX POWER CORPORATION | CORRECT ERROR ON EMISSION SUMMARY TABLE | Standard Permit | Revision | Bastrop · Bastrop | Received |
Sep 18, 2024 | GENTEX POWER CORPORATION | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Bastrop · Bastrop | Received |
Sep 17, 2024 | POWERSECURE INC | ELECTRIC POWER GENERATION | Construction | Initial | Dallas · Dallas | Received |
Sep 17, 2024 | POWERSECURE INC | ELECTRIC POWER GENERATION PLANT | Construction | Initial | Fort Bend · Stafford | Received |
Jul 16, 2024 | HOMESTEAD POWER LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Austin · New ulm | Received |
May 17, 2024 | BULLDOG POWER LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Brazoria · Sweeny | Received |
Apr 11, 2024 | POWERSECURE INC | ELECTRIC POWER GENERATION | Construction | Amendment / Modification | Denton · Cross roads | Received |
Jan 29, 2024 | POWERSECURE INC | ELECTRIC POWER GENERATION | Construction | Initial | Montgomery · New caney | Received |
Jan 10, 2024 | POWERSECURE INC | ELECTRIC POWER GENERATION FACILITY | Construction | Initial | Collin · Prosper | Received |
Sep 10, 2026New | SOLARIS POWER SOLUTIONS LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Ellis · Midlothian | Received |
Sep 4, 2026 | BASE POWER INC | PBR NEW REGISTRATION | Permit by Rule | Initial | Travis · Austin | Received |
Sep 4, 2026New | TEMPLE B2 POWER SOLUTIONS LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Bell · Temple | Received |
Aug 27, 2026 | FORT WORTH POWER CORE LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Briscoe · Silverton | Received |
Aug 26, 2026 | PONDEROSA JOINT POWERS AGENCY | CASE-BY-CASE EXISTING | Construction | Renewal | Harris · Houston | Received |
Aug 19, 2026 | POWERSECURE, INC. | AUTOMATIC RENEWAL 6005 | Standard Permit | Renewal | Nacogdoches · Nacogdoches | Received |
Aug 19, 2026 | LIBERTY POWER INNOVATIONS LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Reeves · Pecos | Received |
Aug 11, 2026 | COOPER POWER SYSTEMS LLC | TRANSFORMER MANUFACTURING FACILITY | Construction | Initial | Nacogdoches · Nacogdoches | Received |
Aug 11, 2026 | RW MILLER POWER LLC | CASE-BY-CASE EXISTING | Construction/Operating | Amendment / Modification | Palo Pinto · Palo pinto | Received |
Aug 11, 2026 | COLETO CREEK POWER, LLC | RENEWAL NOTICE | Construction | Renewal (notice) | Goliad · Fannin | Received |
Aug 11, 2026 | RW MILLER POWER, LLC | ELECTRIC GENERATION FACILITY | Psd | Initial | Palo Pinto · Palo pinto | Received |
Jul 31, 2026 | WOLF HOLLOW I POWER LLC | PBR NEW REGISTRATION | Permit by Rule | Initial | Hood · Granbury | Received |
Jul 16, 2026 | BECHTEL INFRASTRUCTURE AND POWER CORPORATION | TEMPORARY ROCK CRUSHER | Standard Permit | Initial | Reeves · Pecos | Received |
Jul 13, 2026 | COLETO CREEK POWER LLC | NATURAL GAS BOILER | Construction | Amendment / Modification | Goliad · Fannin | Received |
Jul 10, 2026 | STELLA POWER COMPANY LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Caldwell · Mustang ridge | Received |
Jul 1, 2026 | KINETIK POWER LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Reeves · Balmorhea | Received |
Jun 18, 2026 | HIVOLT POWER V LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Loving · Mentone | Received |
Jun 15, 2026 | NRG TEXAS POWER LLC | CASE-BY-CASE EXISTING | Construction | Revision | Chambers · Baytown | Received |
Jun 15, 2026 | NRG TEXAS POWER LLC | CASE-BY-CASE EXISTING | Construction | Sb1126 | Chambers · Baytown | Received |
Jun 13, 2026 | ATTICUS POWER OPCO 1 LLC | STANDARD PERMIT NEW REGISTRATION | Standard Permit | Initial | Bee · Pawnee | Received |